Projects

Midland, TX

Northeast Sewer Line Package A and Package B

Owner

City of Midland, TX

Value

$46.8M

42,000 LF of 36-Inch and 42-Inch FRP Wastewater Pipe

Fort Worth, TX

Lake Arlington Force Main Part 1 and Part 2

Owner

City of Fort Worth, TX

Value

$59.6M

7 miles of 42-Inch Sanitary Sewer Force Main

Bentonville, AR

LITTLE OSAGE CREEK GRAVITY SEWER IMPROVEMENTS SCHEDULES 1-3

Owner

NACA

Value

$25.4M

38,004 LF of 36-inch Gravity Sewer, 4,269 LF of 30-inch Gravity Sewer, 960 LF of 36-inch Fusible through Steel Casing

Bentonville AR, Little Osage Creek Project

Broken Arrow, OK

COUNTY LINE TRUNK SEWER PHASE I
CONTRACT NO. S.1609

Owner

Broken Arrow Municipal Authority

Value

$16.4M

18,810 LF 48-Inch to 60-Inch Sewer Lines, 738 LF 54-Inch & 60-Inch Boring, 1148 LF 42-Inch CIPP

Broken Arrow
JOB LOCATION OWNER JOB NAME DESCRIPTION CONTRACT AMOUNT
ALLEN, TX NTMWD Wilson Creek WWTP Drain Improvements 2800 LF 24-Inch & 36-Inch PVC Sewer, 375 LF 8-Inch or 12-Inch Pipe Bursting, 355 LF 6-Inch to 10-Inch PVC Sewer, 120 LF 24-Inch PVC in 54-Inch Steel Casing by Trenchless Methods $3,852,506
ALVARADO, TX City of Alvarado 24-36" Maple Ave Interceptor Ph II 24-Inch to 36-Inch Sewer, Manholes, 6-Inch and 1-Inch Water Lines & Valves $2,272,000
ALVARADO, TX City of Alvarado 24-36" Maple Avenue Interceptor Phase I 24-Inch to 36-Inch Sewer, 48-Inch and 54-Inch Bores, Manoles, 6-Inch and 12-Inch Water Lines $4,044,166
BOSSIER CITY, LA City of Bossier Citizen's Bank Drive Drainage Pump Station 365 LF 48-Inch & 24-Inch RCP, 993 LF 2-Inch DI Pipe, 158 LF 24-Inch DI Carrier Pipe, 158 LF Steel Casing by Bore $3,272,000
BROKEN BOW, OK City of Broken Bow Wastewater Collection System Improvements Grinder PS, 2-Inch and 3-Inch Force Main, 8-Inch PVC and DIP Gravity Sewer $1,190,789
CORSICANA, TX City of Corsicana I-45 Business Park Sewer Line, Lift Station, and Force Main 12-Inch Gravity Sewer Line to 14 ft deep, 8-Inch and 18-Inch Gravity Sewer Lines, Steel Encasement of 12-Inch Carrier Pipe $1,018,132
CROSSETT, AR City of Crossett East Crosett Sewer Improvements Contract 1 11,250 LF Sanitary Sewer, 14,500 LF force main utilities, and auger borings $6,100,661
EDMOND, OK Edmond Public Works Authority Wastewater Master Plan Project E1-1A, E1-2, Coffee Creek Interceptor 17,228 LF Trench & Backfill, 615 LF 24-Inch, 8,159 LF 42-Inch, 5,181 LF 48-Inch, 3,033 LF 54-Inch Sewer Lines, and 520 LF 5-Inch Bore with Casing $11,412,442
FORNEY, TX Kaufman County Fresh Water Supply District No. 1- A Windmill Farms Regional Sewer Project Package 1 Force Main & Gravity Main 9,229 LF 24-Inch Sewer, 9229 LF 16-Inch Sewer, 1081 LF 27-Inch Gravity Sewer to 10’+ depth, 42-inch Steel Cased Bore under UPRR crossing, 130 LF 30-Inch & 24-Inch Cased Bore $3,938,791
FORNEY, TX Kaufman County Fresh Water Supply District No. 1- A Windmill Farms Regional Sewer Project Package 2 - Gravity Main 2,060 LF 27-Inch and 12,478 LF 30-Inch Gravity Sewer to 20’+ depth, 830 LF 42-Inch Steel Cased Bore $6,105,592
FRISCO, TX City of Frisco 48" & 36" Water Main - Coit to Independence 4,500 LF of 48-Inch Water Distribution Pipe $10,526,292
FRISCO, TX City of Frisco Panther Creek Interceptor Improvements 7,000 LF of 42-Inch Wastewater Interceptor $13,100,66
FRISCO, TX City of Frisco Upper Reuse 24-Inch Pipeline, Phase 2 6,175 LF of 24-inch PVC & fusible PVC divided into two segments using open cut, trenchless bore, directional drilling Installation $5,011,434
GREENVILLE, TX City of Greenville Sanitary Sewer Interceptor Sanitary Sewer Improvement Project 2,623 LF of 18-inch PVC, 1,947 LF of 15-inch PVC, 5,371 LF of 16-inch DI, 30 4ft Manholes $5,380,072
HOT SPRINGS, AR City of Hot Springs Michels Trenchless (GC) - Open Cut Installation of 42" Welded Steel Pipe - Contract 4 2518 LF 42-Inch Welded Steel Pipe Non-Roadway, 120 LF 42-Inch Welded Steel Pipe In-Roadway, 120 LF 42-Inch Welded Steel Pipe Water Crossing $982,853
HOT SPRINGS, AR City of Hot Springs Raw Water Supply Contract 2 10,050 LF of 42-Inch Welded Steel Water Pipe, 1,652 LF of 30-Inch DIP Water Lines, Gate Valves, Flushing Assembly, Air Release Valves, Flow Control Vault, Standpipe, Rock Excavation $10,418,863
HOT SPRINGS, AR City of Hot Springs Raw Water Supply Transmission Pipeline, Contract 1 10,050 LF of 48-inch Welded Steel Water Pipe, 1,652 LF of 30-inch DIP Water Lines, Gate Valves, Flushing Assembly, Air Release Valves, Flow Control Vault, Standpipe $4,671,901
HUGO, OK City of Hugo CDBG Collection System Improvements 24-Inch Sewer Lines, Manholes 4 to 6 FT $344,789
HUTCHINS, TX City of Hutchins Southern Force Main 8555 LF 18-Inch HDPE, 290 LF 18-Inch HDPE in 30-Inch Steel Cased Bore, 140 LF 18-Inch HDPE in 24-Inch Steel Cased Bore, 120 LF 18-Inch HDPE in Concrete Encasement, 122 LF 30-Inch HDPE Sewer FM, 191 LF 30-Inch HDPE in 36-Inch Steel Cased Bore $5,260,359
HUTCHINS, TX City of Hutchins Southern Lift Stations Construction of Lift Station complete including Pumps, Motors, Valves, Electrical etc., Standby Generator, Reinforced Concrete Foundation, Pavement and Sidewalk, Trench Safety Etc $6,698,878
LEWISVILLE, TX City of Lewisville Timber Creek Utility Crossing Phase 2 2040 LF 12-Inch, 1528 LF 21-Inch, 348 LF 30-Inch wastewater lines, 240 LF 30-Inch Steel Cased Bore, 310 LF 30-Inch Drilled Shaft Foundation $4,590,989
LONE STAR, TX City of Lone Star Water and Wastewater System Rehab 7 Lift Stations, 6-15-Inch Piping $2,773,249
MCKINNEY, TX McKinney Municipal Utility District No. 1 of Collin County Trinity Falls Water Lines 8,182 LF 24-Inch Water Line and 6,334 LF 36-inch Water Line $8,940,343
MELISSA, TX NTMWD Gravity Sewer & Leachate Pump Station & Force Main 3x6-inch and 8x12-inch HDPE Force Mains, 6-inch and 8-inch Sewer Mains, Bolted Steel GST, Electrical $1,775,355
MESQUITE, TX NTMWD Waterline Relocations US Hwy 80 326 LF 16-inch Water line in 30-inch DI Cased Bore, 1500 LF 30-inch bar wrapped Water line, 357 LF 30-inch Bar Wrap in 48-inch Steel Cased Bore, 744 LF 36-inch DI Water line, 4-inch Comb ARV, 72-inch Manholes $4,428,576
MT VERNON, TX City of Mt Vernon Wastewater Collection System Replacement & Improvements Phase 2 Rehab Lift Stations, 6-Inch to 10-Inch Sewer Lines, Manholes $1,142,195
ODESSA, TX Colorado River Municipal Water District Odessa Reservoir Area Piping Modifications 60-Inch and 30-Inch Pipelines $10,683,010
OKLAHOMA CITY, OK The OK City Water Utilities Trust WC-0904 Phase IV 72-Inch Water Transmission Main Repair/Replace 72-Inch Waterline Joints $1,471,900
PFLUGERVILLE, TX City of Pflugerville Secondary Colorado River Raw Water Line - Package 4 25,091 LF of 42-Inch and 431 LF of 42-Inch Raw Water Main Installed with 66-Inch Casing by Open Cut, 125 LF of 30-Inch Raw Water Main, and 1,684 LF of 60-Inch Casing Pipe/Tunnel Liner Plate by Other than Open Cut $35,710,451
PLANO, TX NTMWD Beck Branch Parallel Interceptor 1,482 LF of 42-inch & 54-inch FRP Sanitary Sewer, 2,226 LF of 54-inch Cased Bore, 5 Manholes, Carbon Odor Control System, Los Rios Interconnect $5,740,443
PLANO, TX NTMWD Upper East Fork Interceptor System - 121 Force Main Improvements 12,500 LF of 36-Inch Force Main $10,794,721
PRINCETON, TX City of Princeton Tickey Creek Wastewater Improvements - Phase II 9858 LF of 36-Inch PVC Wastewater Line $4,217,310
PRINCETON, TX City of Princeton Water Main CIP Projects 6, 8, and 17 9,309 LF Water Lines $3,479,693
SHERMAN, TX City of Sherman 2022 South Side Industrial Sewer Line, Phase 1 236 LF 8-16-inch PVC, 988 LF 18-inch PVC, 2389 LF 24-inch PVC, 100 LF 24-inch PVC in 48-inch Steel Cased Bore, 5377 LF 30-inch PVC, 376 LF 30-inch PVC in 48-inch Steel Cased Bore, 373 LF Extra Depth $5,741,362
SHREVEPORT, LA City of Shreveport Broadmoor Sewer Outfall Sewer Main Replacement 30, 48, and 54-Inch Gravity Sewer, 72-Inch Cased Bore $5,287,649
SHREVEPORT, LA City of Shreveport Emergency Repair to 48" Gravity Sewer Interceptor Main - Stoner Lift Station 48-inch DIP 18-20-inch deep, 18-inch RCP CL IV, CCTV & Heavy Sewer Line Cleaning, Helical Sheet Piles and Pipe Supports, Well Point Dewatering $1,301,761
SHREVEPORT, LA City of Shreveport Hollywood & Singletary Sewer Improvements 8-Inch to 15-Inch Gravity Sewer and Sewer Access Chambers $4,624,067
SHREVEPORT, LA City of Shreveport Mansfield & Claiborne Sewer Replacement 8-inch to 24-inch Gravity Sewer, 4-6 FT Manholes, Pipe Bursting, Point Repairs $3,051, 227
SHREVEPORT, LA City of Shreveport Queenboro & Choctaw Bayou Sewer Replacement 23,611 LF 8-Inch to 42-Inch Gravity Sewer, 168 ea 4-6-Inch Manholes, 1633 LF 8-Inch to 18-Inch Cased Bores, 29,375 LF 8-Inch to 24-Inch Pipe bursting $13,831,032
SHREVEPORT, LA City of Shreveport Sanitary Sewer Lift Station Condition Improvements New and Rehab 14 Lift Stations Including Pumps, Motors, Control Panels, Piping, Electric $3,818,134
SHREVEPORT, LA City of Shreveport Pierremont Park Gravity Sewer Main Project 12-Inch to 18-Inch RCP Sewer, 8-Inch to 30-Inch PVC Gravity Sewer, Concrete Paving $5,099,248
SHREVEPORT, LA City of Shreveport West Shreveport Lift Station Improvements Rehab of Lift Stations, 8-Inch to 12-Inch Ductile Iron Force Main $1,045,881
TEXARKANA, AR Texarkana Water Utilities Nix Creek Sewer Improvements 7,000 LF of 15-Inch to 30-Inch sewer pipe $3,339,305
TEXARKANA, TX City of Texarkana, TX FM2148 & IH30 Water and Sewer Main Relocation 12-Inch C900 Water and Sewer, 20-Inch Steel Casing by Bore Water and Sewer, ROW Prep 12-Inch SDR26 Sewer, Concrete Manholes, Clean/Test Sewer Main $479,218
TULSA, OK Tulsa Metropolitan Utility Authority Upper Coal Creek Specific Remediation 80-Inch to 30-Inch Sewer Pipe, Manholes and appurtenances $4,932,452
TYLER, TX City of Tyler Consent Decree Capacity Work Group 2 Implementation Sewer Site 13a2 Improvements 18,141 LF of 15-42-Inch Sanitary Sewer Lines $28,191,846
WACO, TX City of Waco Brazos Basin Interceptor Improvements Phase 1a 4,490 LF of 48-Inch gravity wastewater line, 30-Inch and 66-Inch steel casing $16,211,331
WACO, TX City of Waco Flat Rock Road Watewater Improvements 6,275 LF of 27-Inch PVC, 2,150 LF 24-Inch PVC, 95 LF 18-Inch PVC, and 20 LF 8-Inch gravity wastewater line $6,018,372
WACO, TX City of Waco Hwy 84 Corridor Wastewater System Improvements Phase 3 Contract B 7,336 LF 30-Inch, 14 LF 27-Inch, 21 LF 12-Inch, 85 LF 8-Inch, 40 LF 6-Inch, 53 LF 4-Inch, 200 LF 42-Inch steel casing installed by bore, 75 LF 42-Inch casing installed by open cut, 31 LF 16-Inch relocated water line $5,569,871
WYLIE, TX NTMWD Wylie Water Treatment Plant Conversion to Biologically Active Filtration - Phase II Construction of hydraulic mixing channel yard piping, and 816 LF of 96-Inch steel water pipe and 184 LF of 120-Inch steel pipe $28,630,000