42,000 LF of 36-Inch and 42-Inch FRP Wastewater Pipe
7 miles of 42-Inch Sanitary Sewer Force Main
38,004 LF of 36-inch Gravity Sewer, 4,269 LF of 30-inch Gravity Sewer, 960 LF of 36-inch Fusible through Steel Casing
18,810 LF 48-Inch to 60-Inch Sewer Lines, 738 LF 54-Inch & 60-Inch Boring, 1148 LF 42-Inch CIPP
JOB LOCATION | OWNER | JOB NAME | DESCRIPTION | CONTRACT AMOUNT |
ALLEN, TX | NTMWD | Wilson Creek WWTP Drain Improvements | 2800 LF 24-Inch & 36-Inch PVC Sewer, 375 LF 8-Inch or 12-Inch Pipe Bursting, 355 LF 6-Inch to 10-Inch PVC Sewer, 120 LF 24-Inch PVC in 54-Inch Steel Casing by Trenchless Methods | $3,852,506 |
ALVARADO, TX | City of Alvarado | 24-36" Maple Ave Interceptor Ph II | 24-Inch to 36-Inch Sewer, Manholes, 6-Inch and 1-Inch Water Lines & Valves | $2,272,000 |
ALVARADO, TX | City of Alvarado | 24-36" Maple Avenue Interceptor Phase I | 24-Inch to 36-Inch Sewer, 48-Inch and 54-Inch Bores, Manoles, 6-Inch and 12-Inch Water Lines | $4,044,166 |
BOSSIER CITY, LA | City of Bossier | Citizen's Bank Drive Drainage Pump Station | 365 LF 48-Inch & 24-Inch RCP, 993 LF 2-Inch DI Pipe, 158 LF 24-Inch DI Carrier Pipe, 158 LF Steel Casing by Bore | $3,272,000 |
BROKEN BOW, OK | City of Broken Bow | Wastewater Collection System Improvements | Grinder PS, 2-Inch and 3-Inch Force Main, 8-Inch PVC and DIP Gravity Sewer | $1,190,789 |
CORSICANA, TX | City of Corsicana | I-45 Business Park Sewer Line, Lift Station, and Force Main | 12-Inch Gravity Sewer Line to 14 ft deep, 8-Inch and 18-Inch Gravity Sewer Lines, Steel Encasement of 12-Inch Carrier Pipe | $1,018,132 |
CROSSETT, AR | City of Crossett | East Crosett Sewer Improvements Contract 1 | 11,250 LF Sanitary Sewer, 14,500 LF force main utilities, and auger borings | $6,100,661 |
EDMOND, OK | Edmond Public Works Authority | Wastewater Master Plan Project E1-1A, E1-2, Coffee Creek Interceptor | 17,228 LF Trench & Backfill, 615 LF 24-Inch, 8,159 LF 42-Inch, 5,181 LF 48-Inch, 3,033 LF 54-Inch Sewer Lines, and 520 LF 5-Inch Bore with Casing | $11,412,442 |
FORNEY, TX | Kaufman County Fresh Water Supply District No. 1- A | Windmill Farms Regional Sewer Project Package 1 Force Main & Gravity Main | 9,229 LF 24-Inch Sewer, 9229 LF 16-Inch Sewer, 1081 LF 27-Inch Gravity Sewer to 10’+ depth, 42-inch Steel Cased Bore under UPRR crossing, 130 LF 30-Inch & 24-Inch Cased Bore | $3,938,791 |
FORNEY, TX | Kaufman County Fresh Water Supply District No. 1- A | Windmill Farms Regional Sewer Project Package 2 - Gravity Main | 2,060 LF 27-Inch and 12,478 LF 30-Inch Gravity Sewer to 20’+ depth, 830 LF 42-Inch Steel Cased Bore | $6,105,592 |
FRISCO, TX | City of Frisco | 48" & 36" Water Main - Coit to Independence | 4,500 LF of 48-Inch Water Distribution Pipe | $10,526,292 |
FRISCO, TX | City of Frisco | Panther Creek Interceptor Improvements | 7,000 LF of 42-Inch Wastewater Interceptor | $13,100,66 |
FRISCO, TX | City of Frisco | Upper Reuse 24-Inch Pipeline, Phase 2 | 6,175 LF of 24-inch PVC & fusible PVC divided into two segments using open cut, trenchless bore, directional drilling Installation | $5,011,434 |
GREENVILLE, TX | City of Greenville | Sanitary Sewer Interceptor Sanitary Sewer Improvement Project | 2,623 LF of 18-inch PVC, 1,947 LF of 15-inch PVC, 5,371 LF of 16-inch DI, 30 4ft Manholes | $5,380,072 |
HOT SPRINGS, AR | City of Hot Springs | Michels Trenchless (GC) - Open Cut Installation of 42" Welded Steel Pipe - Contract 4 | 2518 LF 42-Inch Welded Steel Pipe Non-Roadway, 120 LF 42-Inch Welded Steel Pipe In-Roadway, 120 LF 42-Inch Welded Steel Pipe Water Crossing | $982,853 |
HOT SPRINGS, AR | City of Hot Springs | Raw Water Supply Contract 2 | 10,050 LF of 42-Inch Welded Steel Water Pipe, 1,652 LF of 30-Inch DIP Water Lines, Gate Valves, Flushing Assembly, Air Release Valves, Flow Control Vault, Standpipe, Rock Excavation | $10,418,863 |
HOT SPRINGS, AR | City of Hot Springs | Raw Water Supply Transmission Pipeline, Contract 1 | 10,050 LF of 48-inch Welded Steel Water Pipe, 1,652 LF of 30-inch DIP Water Lines, Gate Valves, Flushing Assembly, Air Release Valves, Flow Control Vault, Standpipe | $4,671,901 |
HUGO, OK | City of Hugo | CDBG Collection System Improvements | 24-Inch Sewer Lines, Manholes 4 to 6 FT | $344,789 |
HUTCHINS, TX | City of Hutchins | Southern Force Main | 8555 LF 18-Inch HDPE, 290 LF 18-Inch HDPE in 30-Inch Steel Cased Bore, 140 LF 18-Inch HDPE in 24-Inch Steel Cased Bore, 120 LF 18-Inch HDPE in Concrete Encasement, 122 LF 30-Inch HDPE Sewer FM, 191 LF 30-Inch HDPE in 36-Inch Steel Cased Bore | $5,260,359 |
HUTCHINS, TX | City of Hutchins | Southern Lift Stations | Construction of Lift Station complete including Pumps, Motors, Valves, Electrical etc., Standby Generator, Reinforced Concrete Foundation, Pavement and Sidewalk, Trench Safety Etc | $6,698,878 |
LEWISVILLE, TX | City of Lewisville | Timber Creek Utility Crossing Phase 2 | 2040 LF 12-Inch, 1528 LF 21-Inch, 348 LF 30-Inch wastewater lines, 240 LF 30-Inch Steel Cased Bore, 310 LF 30-Inch Drilled Shaft Foundation | $4,590,989 |
LONE STAR, TX | City of Lone Star | Water and Wastewater System | Rehab 7 Lift Stations, 6-15-Inch Piping | $2,773,249 |
MCKINNEY, TX | McKinney Municipal Utility District No. 1 of Collin County | Trinity Falls Water Lines | 8,182 LF 24-Inch Water Line and 6,334 LF 36-inch Water Line | $8,940,343 |
MELISSA, TX | NTMWD | Gravity Sewer & Leachate Pump Station & Force Main | 3x6-inch and 8x12-inch HDPE Force Mains, 6-inch and 8-inch Sewer Mains, Bolted Steel GST, Electrical | $1,775,355 |
MESQUITE, TX | NTMWD | Waterline Relocations US Hwy 80 | 326 LF 16-inch Water line in 30-inch DI Cased Bore, 1500 LF 30-inch bar wrapped Water line, 357 LF 30-inch Bar Wrap in 48-inch Steel Cased Bore, 744 LF 36-inch DI Water line, 4-inch Comb ARV, 72-inch Manholes | $4,428,576 |
MT VERNON, TX | City of Mt Vernon | Wastewater Collection System Replacement & Improvements Phase 2 | Rehab Lift Stations, 6-Inch to 10-Inch Sewer Lines, Manholes | $1,142,195 |
ODESSA, TX | Colorado River Municipal Water District | Odessa Reservoir Area Piping Modifications | 60-Inch and 30-Inch Pipelines | $10,683,010 |
OKLAHOMA CITY, OK | The OK City Water Utilities Trust | WC-0904 Phase IV 72-Inch Water Transmission Main | Repair/Replace 72-Inch Waterline Joints | $1,471,900 |
PFLUGERVILLE, TX | City of Pflugerville | Secondary Colorado River Raw Water Line - Package 4 | 25,091 LF of 42-Inch and 431 LF of 42-Inch Raw Water Main Installed with 66-Inch Casing by Open Cut, 125 LF of 30-Inch Raw Water Main, and 1,684 LF of 60-Inch Casing Pipe/Tunnel Liner Plate by Other than Open Cut | $35,710,451 |
PLANO, TX | NTMWD | Beck Branch Parallel Interceptor | 1,482 LF of 42-inch & 54-inch FRP Sanitary Sewer, 2,226 LF of 54-inch Cased Bore, 5 Manholes, Carbon Odor Control System, Los Rios Interconnect | $5,740,443 |
PLANO, TX | NTMWD | Upper East Fork Interceptor System - 121 Force Main Improvements | 12,500 LF of 36-Inch Force Main | $10,794,721 |
PRINCETON, TX | City of Princeton | Tickey Creek Wastewater Improvements - Phase II | 9858 LF of 36-Inch PVC Wastewater Line | $4,217,310 |
PRINCETON, TX | City of Princeton | Water Main CIP Projects 6, 8, and 17 | 9,309 LF Water Lines | $3,479,693 |
SHERMAN, TX | City of Sherman | 2022 South Side Industrial Sewer Line, Phase 1 | 236 LF 8-16-inch PVC, 988 LF 18-inch PVC, 2389 LF 24-inch PVC, 100 LF 24-inch PVC in 48-inch Steel Cased Bore, 5377 LF 30-inch PVC, 376 LF 30-inch PVC in 48-inch Steel Cased Bore, 373 LF Extra Depth | $5,741,362 |
SHREVEPORT, LA | City of Shreveport | Broadmoor Sewer Outfall Sewer Main Replacement | 30, 48, and 54-Inch Gravity Sewer, 72-Inch Cased Bore | $5,287,649 |
SHREVEPORT, LA | City of Shreveport | Emergency Repair to 48" Gravity Sewer Interceptor Main - Stoner Lift Station | 48-inch DIP 18-20-inch deep, 18-inch RCP CL IV, CCTV & Heavy Sewer Line Cleaning, Helical Sheet Piles and Pipe Supports, Well Point Dewatering | $1,301,761 |
SHREVEPORT, LA | City of Shreveport | Hollywood & Singletary Sewer Improvements | 8-Inch to 15-Inch Gravity Sewer and Sewer Access Chambers | $4,624,067 |
SHREVEPORT, LA | City of Shreveport | Mansfield & Claiborne Sewer Replacement | 8-inch to 24-inch Gravity Sewer, 4-6 FT Manholes, Pipe Bursting, Point Repairs | $3,051, 227 |
SHREVEPORT, LA | City of Shreveport | Queenboro & Choctaw Bayou Sewer Replacement | 23,611 LF 8-Inch to 42-Inch Gravity Sewer, 168 ea 4-6-Inch Manholes, 1633 LF 8-Inch to 18-Inch Cased Bores, 29,375 LF 8-Inch to 24-Inch Pipe bursting | $13,831,032 |
SHREVEPORT, LA | City of Shreveport | Sanitary Sewer Lift Station Condition Improvements | New and Rehab 14 Lift Stations Including Pumps, Motors, Control Panels, Piping, Electric | $3,818,134 |
SHREVEPORT, LA | City of Shreveport | Pierremont Park Gravity Sewer Main Project | 12-Inch to 18-Inch RCP Sewer, 8-Inch to 30-Inch PVC Gravity Sewer, Concrete Paving | $5,099,248 |
SHREVEPORT, LA | City of Shreveport | West Shreveport Lift Station Improvements | Rehab of Lift Stations, 8-Inch to 12-Inch Ductile Iron Force Main | $1,045,881 |
TEXARKANA, AR | Texarkana Water Utilities | Nix Creek Sewer Improvements | 7,000 LF of 15-Inch to 30-Inch sewer pipe | $3,339,305 |
TEXARKANA, TX | City of Texarkana, TX | FM2148 & IH30 Water and Sewer Main Relocation | 12-Inch C900 Water and Sewer, 20-Inch Steel Casing by Bore Water and Sewer, ROW Prep 12-Inch SDR26 Sewer, Concrete Manholes, Clean/Test Sewer Main | $479,218 |
TULSA, OK | Tulsa Metropolitan Utility Authority | Upper Coal Creek Specific Remediation | 80-Inch to 30-Inch Sewer Pipe, Manholes and appurtenances | $4,932,452 |
TYLER, TX | City of Tyler | Consent Decree Capacity Work Group 2 Implementation Sewer Site 13a2 Improvements | 18,141 LF of 15-42-Inch Sanitary Sewer Lines | $28,191,846 |
WACO, TX | City of Waco | Brazos Basin Interceptor Improvements Phase 1a | 4,490 LF of 48-Inch gravity wastewater line, 30-Inch and 66-Inch steel casing | $16,211,331 |
WACO, TX | City of Waco | Flat Rock Road Watewater Improvements | 6,275 LF of 27-Inch PVC, 2,150 LF 24-Inch PVC, 95 LF 18-Inch PVC, and 20 LF 8-Inch gravity wastewater line | $6,018,372 |
WACO, TX | City of Waco | Hwy 84 Corridor Wastewater System Improvements Phase 3 Contract B | 7,336 LF 30-Inch, 14 LF 27-Inch, 21 LF 12-Inch, 85 LF 8-Inch, 40 LF 6-Inch, 53 LF 4-Inch, 200 LF 42-Inch steel casing installed by bore, 75 LF 42-Inch casing installed by open cut, 31 LF 16-Inch relocated water line | $5,569,871 |
WYLIE, TX | NTMWD | Wylie Water Treatment Plant Conversion to Biologically Active Filtration - Phase II | Construction of hydraulic mixing channel yard piping, and 816 LF of 96-Inch steel water pipe and 184 LF of 120-Inch steel pipe | $28,630,000 |